Updates for 51 and Kaiser
The 51 has made good progress since the last update. The Chassis and suspension are complete with with Air Ride operational, the new hydro boast power brake system (operates from the power steering pump) is complete.
The polished custom made aluminium radiator with electric fan and a/c condenser is installed, wiring, battery with Billet box and engine management computer is done.
The engine has been started with the transmission and running gear tested.
a href="https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEihBFNn0mnaBa9jLaFBJaeQLEdx0Ai_RBFQs8LsHWGj94wB3qeFXediHqu9oJo4h1LBK2rQ2s_KDc2R5i9wktSVa-B7NA5wtCrI4bXdEiu0wtPEE08RYVHuHtz8OnbKwMW9EBa7wgxllx8/s1600/002.JPG">
Dash re-installed
Custom radiator installed
Engine running
Hydro boast brake system
Under side of car complete
We have hired an upholstery shop. T3's Custom Interiors, and Martin has built the door panels, package tray, trunk panels, remounted and remodeled the front and back seats
We are waiting for the British broad cloth headliner to come from England and have selected a Mercedes Benz wool carpet that matches the leather from Scotland. All are in the medium tan color with carpet a bit darker.
Next on the agenda the car will be color sanded and polished, the new chrome installed, headliner installed then glass.
The 53 kaiser is well on its way to final paint with the metal work complete, sanding, prime and more sanding now being done.
All the parts, doors, trunk, hood and fenders have been fitted.
We met with the painter a couple of weeks ago and Karen selected the green for the bottom and white for the top.
Next week he should have some painted panels for her review and final selection